Search

Non-usability

https://www.eex-transparency.com/

Planned and unscheduled non-usability of all reported power consumption units

This information contains both planned and unscheduled non-usabilities for units ≥ 10 MW that were reported either today or yesterday. Every non-usability of 100 MW or more that lasts for, at least, one hour has to be reported by the facility operator. In addition, limitations of at least 10 MW lasting for 15 minutes or more can be reported.

All messages are published immediately and can be updated on an on-going basis.

coal:#000000,biomass:#CC9933,garbage:#bdb76b,gas:#87cefa,lignite:#8B4513,oil:#696969,other:#e9967a,pumped-storage:#b0c4de,run-of-the-river:#000080,seasonal-store:#4169e1,solar:#FFCD64,uranium:#a05f82,wind:#afc4a5,total:#cccccc,Biomass:#CC9933,Gas:#87cefa,Coal:#000000,Garbage:#bdb76b,Lignite:#8B4513,Oil:#696969,Other:#e9967a,Pumped Storage:#b0c4de,Run-of-the-river:#000080,Seasonal-store:#4169e1,Solar:#FFCD64,Wind:#afc4a5,Uranium:#a05f82,Total:#cccccc,marine:#839ae1,Marine:#839ae1,oil-shale:#df7123,Oil-shale:#df7123,other-renewable:#ebd8b1,Other-renewable:#ebd8b1,Peat:#bca476,peat:#bca476,water-reservoir:#000066,Water-reservoir:#000033,wind-offshore:#66CC33,Wind-offshore:#66CC33,wind-onshore:#afc4a5,Wind-onshore:#afc4a5,coal-derived-gas:#5c89a6,Coal-derived-gas:#5c89a6,geothermal:#8386e1,Geothermal:#8386e1,water:#66CCFF,uran:#FFFF00,conventional:#838383 ,intraday:#FF0000,day-ahead:#FF0000 ,default:#000000,diff:#FF0000,all-fuels_first :#505050,all-fuels_second:#A0A0A0,planned:#33CCFF,bekannt:#33CCFF,unbekannt:#CC0033,unplanned:#CC0033
200
hourly
250
2009-10-25
1000
3
180
500
50
pub_masterdata_unit.name,pub_masterdata_unit.begin,pub_masterdata_unit.fuel,pub_masterdata_unit.connecting_area,pub_masterdata_unit.capacity
table