Non-usability per unit

This information contains both planned and unscheduled non-usabilities for units including their entire history. Every non-usability of 0,01 GWh/d for injection and withdrawal and 0,0001 TWh for the technical capacity or more that lasts for, at least, one hour has to be reported by the facility operator.

to
to

Type of Event: Injection Unavailability (GWh/d), Withdrawal Unavailability (GWh/d), Storage Unavailability (TWh)